Gas turbines.

Aeroderivative and frame gas turbines for peaking plants, on-site power and backup, from about 5 MW a unit.

Gas turbine generator package, patent-style drawing101214161820222426Fig. 1
Fig. 1. A simple-cycle gas turbine generator package, side view.Illustration, not a specific model.
AeroderivativeFast start, about 5 to 100 MW a unit
FrameHeavy duty, larger units
PackagesTurbine, generator, controls, often a step-up transformer
Where they come fromStandby units, retirements, canceled projects, spares

If you're selling, have ready

  • Make, model and serial numbers
  • Year in service
  • Operating hours, starts and the last major overhaul
  • OEM maintenance records, borescope reports, emissions tests
  • What's included: generator, controls, step-up transformer
  • How it's stored and preserved
  • Removal: who, how fast, any site deadline

If you're buying, ask

  • Hours and starts since the last overhaul
  • Any gaps in the records
  • How it was preserved after shutdown
  • Emissions equipment and what your permit allows
  • Fuel: pipeline gas or dual fuel
  • Generator voltage and frequency (60 Hz in the US, 50 Hz in much of the world)
  • Who pays for removal and shipping

Why existing units matter

New heavy-duty turbines are booked years ahead, and OEMs are selling delivery slots for the end of the decade.

A unit that already exists, on standby or in storage, skips that queue. It still needs its records gathered, an independent inspection and a plan to move it. We find the unit, check the paperwork against public records, and keep both sides moving to a signed contract.

Have a turbine you aren't running, or need one?

Buy Sell